Campaign 1: INTACT, provisional

Update

Campaign 1: INTACT, provisional

  • Type: refresh
  • event_id: 2026-09-06-campaign-01-cpu-shortage-supply-chain-review
  • Source: Campaign thesis review; receipt selector C:cpu-shortage-supply-chain. September 4 settled corpus; issuer dates retained.
    • parent_event: 2026-09-06-theses-read-campaign-01
  • Shift: CPU and substrate constraints remain a working hypothesis; allocation, pricing and utilization must establish which layer captures the economics.
  • Effect on thesis: AMD/Intel allocation or pricing evidence with documented ABF/OSAT utilization and persistent constraints.
1 event

No direct external sources are attached to this read.