EOW Phase 0a check: parent demand-engine health reaffirmed (Meta capex), no nuclear-specific tape this cycle
Event
EOW Phase 0a check: parent demand-engine health reaffirmed (Meta capex), no nuclear-specific tape this cycle
Summary
- Type: monitoring-check (subtype: qualitative continuity, no fresh tape) - event_id: 2026-07-11-nuclear-fuel-cycle-phase-0a-eow-check - Source: social captures 2026-07-08-aleabitoreddit-meta-to-build-a-new-10b-dc-in-canada, 2026-07-09-wliang-meta-is-spending-9b-on-a-new-data-center (cross-referenced from the ai-power-bottleneck 2026-07-11 log entry — same parent-demand-engine evidence). - Shift
Related
3 eventsNo direct external sources are attached to this read.