Watchlist / grid-buildout
watchlist
Watchlist / grid-buildout
current roster plus event stream
symbols 11 events 265 latest
Transformer, switchgear, electrical-equipment, and engineering contractors exposed to transmission and data-center grid buildout.
Showing 120 of 265 events.
| 1D | 7D | 30D | 3M | 1Y | |
|---|---|---|---|---|---|
| cohort | +0.8% | +0.6% | +7.0% | -9.3% | +28.5% |
| SPY | +0.6% | +1.2% | +2.1% | +3.1% | +16.0% |
| Δ | +0.2% | -0.5% | +4.9% | -12.4% | +12.5% |
equal-weight · buy-and-hold from window start, no rebalancing · 3M+ windows are a current-roster backcast.
30D breadth 10/11 up
trend: 8 up · 1 flat · 2 down · avg RSI 55 · 50% above SMA200 · covered 11/11
Holdings
Nov 17
Nov 16
Nov 3
Nov 2
Oct 29
Oct 29
Oct 29
Oct 28
Oct 28
Oct 27
Oct 9
Oct 9
Oct 9
Oct 8
Oct 8
Oct 7
Oct 7
Oct 6
Oct 6
Oct 5
Oct 5
Oct 2
Oct 2
Oct 2
Oct 1
Oct 1
Sep 30
Sep 29
Sep 28
Sep 25
Sep 25
Sep 24
Sep 24
Frontier Map — gas turbines: the plans, the slots and the factories behind the US gas-fired buildout
Frontier Map — gas turbines: the plans, the slots and the factories behind the US gas-fired buildout
Sep 23
Sep 23
Sep 23
Sep 22
Sep 21
Sep 18
Sep 18
Sep 17
Sep 16
Sep 15
Sep 15
Sep 14
Sep 11
Sep 11
Sep 10
Sep 8
Sep 4
Sep 4
Sep 3
Sep 2
Sep 2
Sep 1
Aug 31
Aug 28
Aug 28
Aug 27
The AI Money Went Into the Ecosystem, Not Into Nvidia
Market signal state changed.
Aug 26
Aug 25
Aug 24
Aug 23
Aug 22
Aug 22
Aug 21
Aug 20
Transmission is the binding constraint on new generation — Pepco's rights-of-way rebuild is the template
Transmission is the binding constraint on new generation — Pepco's rights-of-way rebuild is the template
Aug 18
Aug 14
Aug 14
Aug 13
Aug 12
Aug 8
Aug 8
Aug 4
Aug 4
Aug 4
Aug 3
Aug 3
Jul 31
Jul 31
Jul 31
Jul 30
Jul 30
Jul 30
Jul 29
Jul 29
Feed generated 2026-10-09.